Electrical

Min. weight that fires one cell. 6 cells per tile = 6 × W kg trigger load.
Body weight acts on the stepped tile (often 1 foot, ≈½ body weight).
1.0 = static (standing). ~0.6–0.8 typical mid-stride.
Normal adult ≈ 14 steps / 10 m (stride ≈ 0.7 m).
Empty mall corridor: ~50. Busy station walkway: ~1000–2000.

Physical / material

Spec sheet: 150 g (50 mm × 25 mm piezo disc).
6061-T6: 2.70. 7075: 2.81. Cast Al: 2.6–2.8.
Plastic-ceramic composite: 1.5–2.2 typical. Glass-filled PA: 1.5. Mineral-filled PP: 1.8–2.1.
—
Hexes in 1 m × 1 m
—
Area per hex (cm²)
—
Active cells / step
—
Power per tile per step (mW)
—
Power per 10 m pass (W)
—
Energy per person-hour (Wh)
—
Per m² per 12 h (busy walkway)
—
Per m² per 24 h (your traffic)
—
Per m² per year (kWh)
—
Load per cell (kg)

Mass & BOM — per-tile and per-pavement

—
Generators / tile (6 × per hex)
—
Aluminium tile (kg)
—
Composite support (kg)
—
TOTAL per tile (kg)
—
kg / m² (loaded pavement)
—
Pavement total (kg)
—
Pavement total (tonnes)
—
Generators in pavement
—
Equivalent static load (kN/m²)
— Generators — Aluminium — Support
Mass formulas (per hex tile)
  • Hex area: A = (3√3 / 2) · L² (L in metres).
  • Generators: 6 × m_gen (six corner cells).
  • Aluminium: ρ_Al · A · t_tile / 1000 kg (ρ in g/cm³, t in mm).
  • Support: ρ_PC · A · t_supp / 1000 kg.
  • Total per tile: sum of the three above.
  • kg / m² = total_per_tile × hexes_per_m².
  • Pavement total = kg / m² × area.
  • Static load (kN/m²) = (kg / m²) × 9.81 / 1000.

Pavement 2 m × 10 m = 20 m²

—
Total hexes in pavement
—
Total load cells
—
kWh / year (whole pavement)
—
kg CO₂ avoided / year
—
LED-on hours / year (your LED)
—
Phone-charges / year (10 Wh each)
10.0 m 2.0 m
How the pavement totals are calculated
  • Pavement area = W × L (default 2 m × 10 m = 20 m²).
  • Total hexes = hexes_per_m² × area (same hex size as the 1 m × 1 m view).
  • Total cells = total hexes × 6 corners.
  • Pavement kWh/yr = per-m² kWh/yr × area.
  • CO₂ avoided = kWh × 0.6 kg CO₂/kWh (HK grid emission factor, CLP 2023 published).
  • LED-on hours = kWh × 1000 / LED_W (assumes continuous drain at the stated wattage).
  • Phone-charges = kWh × 1000 / 10 Wh (typical partial phone top-up).
1.0 m 1.0 m
Formulas used (electrical)
  • Hex area: A = (3√3 / 2) · L²
  • Hex width (pointy-top): w = √3 · L, height: h = 2 · L
  • Hexes per 1 m²: cols = ⌊1 / w⌋, rows = ⌊1 / h⌋, total cols · rows
  • Trigger load per cell: W. Cells per tile: 6 (one per corner joint).
  • Force on stepped tile: F = body · foot_share kg.
  • Active cells: n = clamp(round(F / W), 1, 6).
  • Power per tile per step: P = n · mW_cell.
  • Power per 10 m pass: P · steps / 1000 W (assuming each step on a fresh tile).
  • Sustained W/m² at 1 step/s: P · (hexes_per_m²) / 1000.
  • Daily kWh / m² at 0.5 step/s for 12 h: P · 0.5 · 43200 / 3.6e6.